Nashik: Anyone travelling the Nashik-Tryambak road will need to time their journey carefully for four days. Girders are being installed on the Nandini river bridge at Pimpalgaon Bahula, and the road will be closed to all vehicles three times a day from Tuesday, November 24 to Friday, November 27.
The traffic notification has been issued by the deputy commissioner of police, Nashik city traffic branch. The closures run from 5 am to 6 am, 1 pm to 2 pm and 3.30 pm to 4.30 pm, one hour each. No vehicle of any kind will be allowed across the bridge in those windows.
Outside those hours the road stays open. The traffic police have asked drivers to follow instructions from officers and wardens at the work site.
Traffic is stopped only while a girder is being lifted, because vehicles passing underneath the span at that moment are at risk. The full closure ends when the work finishes.
The work is part of the road widening being carried out ahead of the Sinhastha Kumbh Mela. One side of the bridge is nearly complete and work has begun on the other, with girders being placed on the pillars of the right-hand span over the Nandini.
Devotees and tourists heading to Tryambakeshwar have been asked to avoid those windows. The early-morning closure will catch travellers who set out before dawn, and they will need the alternative route.
Traffic police have issued the diversion details and asked local commuters to check them before leaving.
Nashik has a large volume of infrastructure work under way for the Kumbh Mela, and road configurations around the city have been changing repeatedly through the year. Officials have asked residents to check the traffic police notification before travelling.